CMI installed Stelcor Micropiles, ICF grade beams and EPS Geo-Joist slab system for this new gas station project in Erie, PA. We have the capabilities to provide complete design and installation of foundation packages including the floor slab where poor soil conditions exist. Our systems eliminate the need for over excavation and fill, which saves both time and money especially for sites with brownfield conditions or high water tables.
We installed 3.5″ Stelcor Micro Piles and Steel grade beams to support this new 7,000 square foot building over poor soils. Once the piles were installed, our Geo-Joist system was installed to create a structural “joist” slab and provide frost protection so that the excavation was very minimal. This approach saved considerable time over traditional footing/ structural slab building.